Serving the Greater Milwaukee Area
    Pallet Flow Rack warehouse storage example
    Germantown, Wisconsin

    Pallet Flow Rack in Germantown, WI

    Pallet flow rack in Germantown fits the tall distribution and plastics buildings along I-41, where lanes can climb several levels. Loads enter from a rear aisle and travel by gravity to the picking side.

    Stock rotates oldest-first with no extra handling. We are a division of Warehouse Equipment & Supplies Co., supplying and installing since 1997.

    Plastics plants also produce finished goods in long runs that ship over weeks. Flow lanes hold those runs in order and present the oldest pallets to shipping first. When a run changes, the lane simply empties and the next part number takes over. That flexibility suits molders whose part mix changes with customer orders through the year.

    (414) 260-3593

    Germantown Business Parks and Pallet Flow Rack

    Gateway Corporate Park and the Holy Hill Road business parks have tall buildings with wide bays, good for multi-level lane blocks.

    Plastics molders here use gravity flow rack for resin lots, feeding presses in arrival order.

    Distribution users load lanes from receiving and pick outbound orders on the opposite face.

    Distribution users in Gateway Corporate Park often inherit a previous tenant's layout. Rather than keep it, we redraw from the column grid outward, which frequently frees room for a lane block with load and pick aisles where they work best. A fresh drawing also lets us place the block close to the docks that handle the most volume, shortening every trip.

    Germantown's I-41 access also means many sites ship north and west across Wisconsin daily. Placing flow pick faces close to those outbound docks shortens the last move before a trailer leaves the yard.

    Multi-level lanes in tall bays
    Resin fed in arrival order
    Clearance set for gaylords
    Pallet flow rack lanes with gravity rollers installed
    Flow racking system loaded with pallets at the pick face

    Holy Hill Road and Gateway Corporate Park

    Distribution, plastics and manufacturing along I-41 run tall buildings with heavy inbound volume.

    Distribution
    Plastics
    Manufacturing

    Designing Pallet Flow Racking for Tall Floors

    Height and load shape drive these layouts.

    1

    Measure loads

    Gaylord height sets beam elevation and clearance.

    2

    Check reach

    The highest lane must be within truck reach.

    3

    Space brakes

    Heavy resin loads need speed control.

    4

    Rate frames

    Frames are confirmed at your beam spacing.

    Germantown Gravity Flow Rack Quotes

    Gaylords on pallets need clearance above each roller bed and correct board direction.

    At height, lift reach and frame capacity are checked together.

    Brakes are spaced for your heaviest load, and separators sit at every pick face.

    Shift changes set the pace for experienced installation crews we schedule and manage, who and anchor lanes to the floor.

    Molders usually run a few resin grades at high volume. Those grades earn deep pallet flow rack lanes; specialty grades stay in selective bays.

    Holy Hill Road buildings often have long dock walls. A lane block running parallel to the docks lets receiving load from one side and production pull from the other.

    Pallet condition matters; gaylords on broken pallets hang up. A restack step at receiving keeps lanes clear.

    Speed controllers follow load weight, and the slope keeps every pallet moving at a walking pace.

    Tall buildings give options. We compare more levels against deeper lanes to find the layout with the most usable positions.

    The quote breaks out material, freight and installation as separate lines.

    Compare the storage choices for your operation: Germantown storage; flow system page; Germantown pushback; Germantown carton flow.

    Resin lot rotation
    Distribution outbound
    Tall I-41 buildings
    Press feeding
    Call (414) 260-3593

    Recent Installations

    A sample of warehouse racking installations.

    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation
    Pallet rack installation

    Get a Germantown Layout

    Send load heights and truck specs on the form, or phone: (414) 260-3593.

    Milwaukee Pallet Rack

    7311 W Greenfield Ave.

    Ste 316

    Milwaukee, WI 53214

    (414) 260-3593

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Germantown Flow FAQs

    Nearby Areas We Also Serve

    Our delivery and installation territory covers southeastern Wisconsin, with scope and scheduling agreed for each building.

    Warehouse Relocation in Germantown

    Where We Work

    Located in Milwaukee, we serve the entire Milwaukee metro with industrial pallet racks and warehouse storage solutions.

    Milwaukee Pallet Rack

    Address

    7311 W Greenfield Ave.
    Ste 316
    Milwaukee, WI 53214

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Pallet Flow Rack in Germantown?

    Call (414) 260-3593 or request a quote and we will get a layout started.

    (414) 260-3593
    Tap to Call